English | 中文

Current Location:Home>News>Industry dynamics

  • Technical disclosure of EPS insulation board

    Release Time:2022-04-20 17:47:57      Hit Count:794

    1.1 raw material requirements:




    1. 1. 1. Raw materials entering the construction site must have factory certificate or test sheet.




    1.1.2 polystyrene board adopts self extinguishing board with unit weight of 18-20kg / m3. It shall be placed flatly to prevent rain and sun exposure.




    1. 1. 3. The cement is 32.5 # ordinary portland cement and 425# sulphoaluminate cement. The cement must have the ex factory date. If there is caking or the ex factory date exceeds 3 months, the use must be determined according to the test results.




    1. 1. 4. Adopt fineness modulus of 2.0-2.8 to screen out sand with particles larger than 2.5 mm, and its mud content is less than 1%.




    1.1. 5 the glass fiber cloth must be placed in a dry place, and the ground must be flat. It should be placed vertically and flat to avoid staggered placement.




    2.1 base course treatment




    2. 1. 1. The wall surface of EPS external wall insulation system shall be plastered and the base course shall be leveled. The flatness of the wall surface shall be tested with a 2m guiding rule, the flatness shall be ≤ 3mm, and the internal and external corners shall be square. Local unevenness and excess parts shall be leveled with 1:2 cement mortar.




    2. 1. 2. The surface of base course shall be smooth, firm, dry and free from pollution or other harmful materials.




    2.1. 3. The fire ladder, downpipe, anti-theft window embedded parts or other embedded parts, inlet pipeline or other reserved holes outside the wall shall be constructed in advance according to the requirements of design drawings or construction acceptance specifications.




    3.1 construction requirements:




    2. 1. 1. The construction temperature shall not be lower than 5 ℃, and the temperature shall be higher than 5 ℃ within 24 hours after the completion of construction. When it is hot in summer, it is not suitable to construct under strong light.




    3. 1. 2. No operation is allowed in case of wind above level 4 or rainy days.




    3.1. 3 before plastering the leveling layer, the plastered part shall be watered half an hour in advance according to the situation.




    3. 1. 4. 1:3 cement mortar shall be used for leveling course.




    3. 1. 5. The horizontal angle and vertical angle of window and window arm shall be hung for construction.




    4.1 construction of Kelon EPS exterior wall insulation system




    4. 1. 1 construction procedure




    Base surface inspection or treatment → tool preparation → internal and external corners, door and window arm hanging line → base wall wetting → preparation of polymer mortar, selection of EPS board → pasting EPS board → EPS board caulking, grinding and leveling wall → preparation of polymer mortar → EPS board surface plastering polymer mortar, door and window opening treatment, pasting glass fiber mesh, surface plastering polymer mortar → leveling and repair, embedding sealing paste → external finish




    4. 1. 2 paste EPS board




    4. 1. 2.1 tool details




    1. Saw blade or knife saw




    2. Polish the coarse sandpaper file or special tool of EPS board




    3. Small presser or iron spoon




    4. Aluminum alloy guiding rule




    5. Iron tape




    6. Rope and Pendant




    7. Ink fountain




    4. 1. 2.2 batching tools




    1. Suggestion for 1 m ash tank × 0.4m × 0.3m)




    2. small iron flat spade




    3. Leakage lifting (1kg / piece or 5kg / piece)




    4. Plastic bucket (it is recommended to hold 15kg cement as the measuring bucket)




    5. Iron screen (16 mesh)




    4. 1. 2.3 paste polystyrene board (EPS board)




    1. A specially assigned person must be responsible for the preparation of polymer mortar to ensure the mixing quality.




    2. Turn the end of the barrel counterclockwise and re stir the adhesive with a stirrer or other tools to avoid separation of the adhesive. Stir appropriately to avoid quality problems.




    3. Mix proportion of polymer mortar: KL binder: 425# ordinary portland cement: sand (with 16 mesh sieve bottom): = 1:1.88:4.97 (weight ratio)




    4. Weigh the bucket of cement and sand and pour it into the iron ash tank for mixing. After mixing evenly, add binder according to the mix proportion for mixing. The mixing must be uniform to avoid segregation and porridge. Water can be added appropriately according to the workability.




    5. Water is used for concrete.




    6. Polymer mortar shall be prepared with use, and the prepared polymer mortar shall be used up within 1 hour. Polymer mortar shall be placed in a cool place to avoid sun exposure.




    7. If the wall is dry before the polystyrene board is pasted, sprinkle water in advance to wet it. The polystyrene board shall be pasted step by step from top to bottom. Before pasting, the vertical line and horizontal line shall be hung first, and the Board shall be pasted with the line. In order to prevent the paved board from sliding up and down, use u-hook to pull the upper and lower layers for temporary fixation. The upper and lower layers of plates must be overlapped with staggered joints, the overlapping length should not be less than 1 / 3 of the plate length, and the internal and external corners should be overlapped with stubble.




    8. When pasting polystyrene board, dot the benzene board, such as (600mm) on each board × 600mm as an example) 16 points, the edge point should be 25mm away from the slab edge, the diameter of mortar point is about 60mm and the thickness is 10mm; The pasting diameter is 100mm, the thickness is 2-3mm, the center distance between points is 150mm-200mm, and the pasting wall area is 30% of EPS board.




    9. The periphery of door and window openings, plinths, deformation joints, parapets and other embedded parts shall be covered with polymer mortar. The bandwidth is 60mm, the thickness is 10mm, and then on the polystyrene board (600mm) × 600mm) and the rest shall be painted with 12 points. The bonding wall area is 50% of EPS board.




    10. When pasting polystyrene board, all bonding joints shall be in contact with the base layer at the same time, and the two hands shall be rubbed evenly left and right for 5-7 times to make the polymer mortar stick to the wall firmly.




    11. When pasting polystyrene board, first paste it from the periphery of door and window openings, and put the plate to be cut in the middle..




    12. When pasting the canopy, corner and deformation joint, turn over the package, and bond the standard mesh with the width of 200mm-260mm to the wall with the bonding width of 70mm.




    13. For the polystyrene board pasted on the base course, the gap between the boards shall not be greater than 2mm, the board surface shall be vertical and flat, the allowable deviation shall not exceed 3mm, and the height difference of the board surface shall not exceed 1.5mm.




    14. When pasting, the polymer mortar on the extrusion plate side shall be removed with an ash knife.




    15. For small joints between plates caused by blanking size deviation or cutting, polystyrene plates shall be cut into appropriate small pieces and inserted into the joints.




    16. After the polystyrene board is pasted with a certain area, check it with a 2m guiding rule, flatten and compact the board, and conduct preliminary leveling to prepare for the next process.




    17. Polish the whole wall after the benzene board is pasted for 24 hours. Polish the whole wall with coarse sand paper or special tools. Do not polish along the parallel direction of the board joint, but make a gentle circular movement to smooth the uneven part. After the wall is polished, clean the debris of polystyrene board, and check the flatness with a 2m guiding rule at the same time.




    18. The construction of mesh cloth must be carried out 24 hours after the polystyrene board is pasted, and it is ensured that the process of wiping cloth on the sunny surface is arranged first.




    19. 5mm gap shall be reserved at the top of parapet or the lower part of projection to facilitate the embedding of grid cloth.




    20. The decorative dividing strip must be grooved with the dividing line slotter 24 hours after the EPS board is pasted.




    21. Polymer mortar can be applied on the side of EPS board except for the side of EPS board with inverted mesh cloth, and polymer mortar shall not be applied on the side of EPS board under other circumstances.